Perfection Through Precision
We understand that our towers are mission-critical for your organization. Every time we deploy a tower in the field we take that information and use it to make our future towers better. These post mortems make us confident that we can handle any situation that may arise.

Technicals that speak for themselves
The Axiom 106 was successfully loaded to approximately 80 MPH, (unguyed) with 375 LBS dead load, and approximately 20 SQ FT. The tower was left loaded for 13 consecutive days without any noticeable structural deformation.

Real World Capable
Load bearing rigging brackets were tested to failure of the rigging cable to ensure rigging brackets are in excess of 100% the WLL of the Ø5/16” - 7x19 wire rope.

Stonger than the Competition